Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 22 results ...

Bingham, E, Gibson, G E and Asmar, M E (2018) Measuring User Perceptions of Popular Transportation Project Delivery Methods Using Least Significant Difference Intervals and Multiple Range Tests. Journal of Construction Engineering and Management, 144(06).

Chang, C and Yu, S (2018) Three-Variance Approach for Updating Earned Value Management. Journal of Construction Engineering and Management, 144(06).

de la Garza, J M and Pishdad-Bozorgi, P (2018) Workflow Process Model for Flash Track Projects. Journal of Construction Engineering and Management, 144(06).

El-adaway, I H, Abotaleb, I S, Eid, M S, May, S, Netherton, L and Vest, J (2018) Contract administration guidelines for public infrastructure projects in the United States and Saudi Arabia: comparative analysis approach. Journal of Construction Engineering and Management, 144(06), 04018031.

Guo, H, Yu, Y, Ding, Q and Skitmore, M (2018) Image-and-Skeleton-Based Parameterized Approach to Real-Time Identification of Construction Workers’ Unsafe Behaviors. Journal of Construction Engineering and Management, 144(06).

Ham, N, Moon, S, Kim, J and Kim, J (2018) Economic Analysis of Design Errors in BIM-Based High-Rise Construction Projects: Case Study of Haeundae L Project. Journal of Construction Engineering and Management, 144(06).

  • Type: Journal Article
  • Keywords: High-rise building; Design error; Building information modeling (BIM); Design validation; Rework; Delay; Cost analysis; Return on investments (ROI);
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001498
  • Abstract:
    Design errors are one of the major risk factors causing rework and delay. Therefore, accurate cost analysis of potential economic losses attributable to design errors is crucial from a practical point of view. This paper proposes a basis for establishing building information modeling (BIM) investment strategies by quantifying the various costs associated with design errors for error prevention. The design errors were classified into three basic types: simple design (Type 1); rework-related (Type 2) that may lead to demolition and rework; and delay-related (Type 3) likely to prolong the construction period. To evaluate the effects of BIM application quantitatively, the performance potential of BIM-assisted identification of individual design errors was examined. A comparison of the influences of classified design errors on the project revealed that the total cost of the design errors leading to schedule delay was 194.69% higher than that of the simple design errors and the direct design error costs due to errors leading to demolition and rework.

Han, Y, Li, Y, Taylor, J E and Zhong, J (2018) Characteristics and Evolution of Innovative Collaboration Networks in Architecture, Engineering, and Construction: Study of National Prize-Winning Projects in China. Journal of Construction Engineering and Management, 144(06).

Kosonen, H K and Kim, A A (2018) Mental Model Approach to Wastewater Treatment Plant Project Delivery during Emergency Response. Journal of Construction Engineering and Management, 144(06).

Kwon, N, Song, K, Lee, H, Kim, J and Park, M (2018) Construction Noise Risk Assessment Model Focusing on Construction Equipment. Journal of Construction Engineering and Management, 144(06).

Liu, D, Lu, W and Niu, Y (2018) Extended Technology-Acceptance Model to Make Smart Construction Systems Successful. Journal of Construction Engineering and Management, 144(06).

Liu, X, Song, Y, Yi, W, Wang, X and Zhu, J (2018) Comparing the Random Forest with the Generalized Additive Model to Evaluate the Impacts of Outdoor Ambient Environmental Factors on Scaffolding Construction Productivity. Journal of Construction Engineering and Management, 144(06).

Liu, Z, Wang, H and Li, H (2018) Model of Equipment Sharing between Contractors on Construction Projects. Journal of Construction Engineering and Management, 144(06).

Nzabonimpa, J D and Hong, W (2018) Novel Precast Erection Method of Interlocking Mechanical Joints Using Couplers. Journal of Construction Engineering and Management, 144(06).

Rahimi, Y, Tavakkoli-Moghaddam, R, Iranmanesh, S H and Vaez-Alaei, M (2018) Hybrid Approach to Construction Project Risk Management with Simultaneous FMEA/ISO 31000/Evolutionary Algorithms: Empirical Optimization Study. Journal of Construction Engineering and Management, 144(06).

Raoufi, M and Fayek, A R (2018) Key Moderators of the Relationship between Construction Crew Motivation and Performance. Journal of Construction Engineering and Management, 144(06).

Shaofeng, L, Jincai, F, Pinghua, Z and Xiang, L (2018) Stability Analysis of Two Parallel Closely Spaced Tunnels Based on Convergence–Confinement Principle. Journal of Construction Engineering and Management, 144(06).

Sherratt, F, Welfare, K, Hallowell, M and Hoque Tania, M (2018) Legalized Recreational Marijuana: Safety, Ethical, and Legal Perceptions of the Workforce. Journal of Construction Engineering and Management, 144(06).

Vaux, J S and Kirk, W M (2018) Relationship Conflict in Construction Management: Performance and Productivity Problem. Journal of Construction Engineering and Management, 144(06).

Walters, J P, Kaminsky, J and Huepe, C (2018) Factors Influencing Household Solar Adoption in Santiago, Chile. Journal of Construction Engineering and Management, 144(06).

Yoon, S, Kang, K, Yoon, Y, Hastak, M and Ji, R (2018) Systematic Decision-Making Process for Composite Pavement Maintenance. Journal of Construction Engineering and Management, 144(06).

Yu, J and Leung, M (2018) Structural Stakeholder Model in Public Engagement for Construction Development Projects. Journal of Construction Engineering and Management, 144(06).

Zhao, T, Liu, W, Zhang, L and Zhou, W (2018) Retracted: Cluster Analysis of Risk Factors from Near-Miss and Accident Reports in Tunneling Excavation. Journal of Construction Engineering and Management, 144(06).